One of the essential roles of Sewerage Systems is stormwater |
||
|
drainage. Efficient stormwater drainage control is needed to |
||
|
secure Citizen's life and property against flooding and |
||
|
contribute to the sound urban development. |
||
|
Please refer to |
||
| http://www.sbmc.or.jp/english/051026/Major_Objectives_of_ Sewerage_Systems.htm |
||
|
In Japan, "Development of Safety City for Heavy Rain" is one |
||
| of important target outcomes in "Infrastructure Intensive | ||
| Development Plan" formulated by Ministry of Land Infrastructure | ||
| and Transport. | ||
| Please refer to | ||
| http://www.sbmc.or.jp/english/infrastructure/infrastructure.htm | ||
|
In recent year, total amount of stormwater runoff has been |
||
| increasing because of reduction of permeable area by urban | ||
| development. Before urbanization, there is wide permeable area | ||
| such as farming land and forest, but after urbanization, | ||
| rainwater permeable area has decreased as a result of increase | ||
| of roads area, construction of buildings, etc. Then, most of | ||
| rainwater dose not penetrate into the ground, and total amount | ||
| of stormwater runoff has increased. However, the flowing | ||
| capacity of existing rivers or channels is usually constant | ||
| and increased amount of stormwater runoff has caused the | ||
| flooding in urban area. (Fig-1) | ||
| Before Urbanization (Wide permeable area like farm land, forest, etc.) |
After Urbanization (Reduction of permeable area as a result of increaseof building, houses, roads, etc.) |
||
![]() |
![]() |
||
| Much Rainwater Infiltration into Ground Less Stormwater Runoff |
Little Rainwater Infiltration into Ground Much Stormwater Runoff |
||
![]() |
![]() |
||
| 1945 (Before Urbanization) | 1988 (After Urbanization) | ||
| Fig.1 Occurrence of Flooding in Urban Area by Increase of Stormwater Runoff Amount | |||
| By urbanization, flooding has often occurred in the | ||
| developed area where there had been no flooding. To cope | ||
| with this kind of flooding in urban area,folowing counter | ||
| measures have been implemented. | ||
| 1) | Construction of Stormwater Drainage Facilities such | |
| as Trunk Stormwater Pipe and Pumping Facilities | ||
| To make up for shortage of flowing capacity of existing | ||
| stream or river for increased stormwater runoff amount, | ||
| rainwater drainage pipe has been constructed. Usually, | ||
| there is little space for drainage facility in urban area, | ||
| these pipes are constructed under ground. As collected | ||
| rainwater in the pipe is transported by gravity, at the end | ||
| of the pipe, pumping facility is constructed to lift the | ||
| rainwater and discharge it to the main river or ocean. | ||
| In Osaka City, Naniwa Grand Floodway construction project | ||
| consisting of Suminoe Pumping Station with a capacity of | ||
| 75m3/s and 12.2 km long trunk sewer with maximum inside | ||
| diameter of 6.5m was completed in 1999, and commenced | ||
| full-scale operation in April, 2000. | ||
![]() |
|
| Fig.2 Naniwa Grand Floodway Project in Osaka City | |
![]() |
|
| Fig-3 Construction of large diameter stormwater pipe | |
| 2) |
Construction of Rainwater Storage Facilities |
||
| In rain event, some part of stormwater is stored | |||
| in storage facilities to prevent the flooding. Stored | |||
| rainwater is discharged to the river after rain event. | |||
| Rainwater storage facility has an effect to reduce peak | |||
| flow by storage, though total stormwater runoff amount | |||
| is not reduced. There are two types of storage facilities, | |||
| On-site type and Off-site type. In the case of On-site | |||
| type, rainwater is stored under the park or playground, | |||
| and in the case of Off-site type such as stormwater | |||
| reservoir for flood control, stormwater tank, and stormwater | |||
| storage pipe, rainwater is collected, transported and stored | |||
| at other location. | |||
![]() |
![]() |
|
| In Dry Weather | In Rain Event | |
|
Fig.4 Stromwater Reservoir for Flood Control |
||
| 3) |
Constriction of Stormwater Infiltration Facilities |
|
| By installing stormwater infiltration facilities such as | ||
| infiltration inlet, infiltration trench and permeable pavement, | ||
| part of rainwater penetrates into the ground, and total storwater | ||
| runoff can be reduced to prevent the flooding. | ||
![]() |
||
| Conventional type inlet and pipe | Infiltration Pipe and Inlet made from porous | |
| concree | ||
| Fig.5 Example of Stromwater Infiltration Facilities | ||
|
In addition to these constructions of facilities, following |
||
| measures are also quite important. | ||
| 1) |
Provision of information to the residents |
|
| It is desired that hazard map indicating the danger area | ||
| for flooding and degree of flood risk, means of escape, | ||
| etc. are informed to the residents in advance. | ||
| 2) | Information sharing | |
| Relating information should be shared with river | ||
| administrator, responsible person of underground facilities | ||
| like subway, mall, etc. | ||
| 3) | Rapid and efficient management | |
| Rapid and effective management by installing of rainfall | ||
| radar and rainfall information system, remote control of | ||
| pumping facilities, etc. are also conducted in Japan. | ||
![]() |
![]() |
|
|
Fig-7 Installed Rainfall Radar |
||
![]() |
||
| Fig.6 Rader installed on the top of 200m-high | Fig.8 Real Time Precipitation Scope | |
| building in Osaka City | ||
| In Osaka City, a rainfall radar has been installed on the | ||
| roof of a 200m-hgh building in the city to observe rainfall | ||
| on a real time basis to minimize flood damage. The observed | ||
| data are transmitted online to Wastewater Treatment Plants, | ||
| Pumping Stations, and other facilities to control | ||
| facilities and respond accurately to citizen's inquiries. | ||
| "Rainfall Information Service" has been implemented since | ||
| 1999, and criticizens can directly access radar information | ||
| on rainfall via facsimile or the Internet. | ||
| (Data and photos from Leaflet "Sewage Works in Osaka" | ||
| published by Osaka City) | ||
|
In order to cope with flooding in urban area, provision |
||
| of information to the residents, information sharing, | ||
| and rapid and efficient management are important in | ||
| addition to the construction of stormwater drainage, | ||
| storage, and infiltration facilities, and comprehensive | ||
| countermeasures for flooding in urban area should be | ||
| established in cooperation with local communities | ||
| and residents. | ||
| >>Category top | ||
![]() |
||