In Japan, Sewerage Systems (Sewer collection systems and |
|
Wastewater Treatment Plant) were adopted in urban area or |
|
high population density area. |
|
All of generated wastewater in this area is collected and |
|
transported by sewer systems and treated by Wastewater |
|
Treatment Plant. Sewered Population Rate, percent of |
|
total population served by sewerage systems (Wastewater |
|
treatment plants connected with sewer systems) as of 2006 |
|
was 70%. |
|
|
|
 |
|
|
|
|
|
On the other hand, in rural area, individual household |
|
treatment system(Joukasou) which is deferent from Septic |
|
Tank is adopted, because the construction cost for sewer |
|
systems, or transportation cost of wastewater to WTP will |
|
increase when the sewerage systems are adopted in rural area |
|
of which population density is low. (This systemfs population |
|
served rete is about 8% as of 2006.) |
|
|
|
In this case, on-site treatment system (JOUKASOU; individual |
|
household treatment system) is more cost effective than |
|
off-site treatment system including wastewater collection |
|
pipes and WTP. |
|
Generated wastewater in a household is treated on-site by |
|
Joukasou utilizing settlement, microorganisms activity, etc. |
|
and settled sludge is removed (usually once a year) and |
|
and transported to sludge treatment facility by truck. |
|
|
|
|
|
 |
|
|
| @ |

|
|
JOUKASOU System |
|
(individual household treatment system) |
|
|
|
|
|

|
|
Example of Construction of JOUKASOU SYSTEM |
|
|
|
(Above 4 Figures are quoted from gJoukasou |
|
Systems for Domestic Wastewater Treatmenth |
|
published by Japan Education Center of |
|
Environmental Sanitation) |
|
|
|
The selection criteria for these systems is based on cost |
|
effectiveness or cost comparison between connection pipe |
|
construction cost between two houses, and joukasou. |
|
|
|
If Joukasou construction cost is higher than connecting pipe |
|
construction cost between two houses, sewerage systems will be |
|
adopted, and vice versa. |
|
Namely, in a low population density area (left part of next |
|
figure), connecting pipe construction cost per capita is higher |
|
than Joukasou construction cost per capita, and Joukasou will
|
|
be adopted. |
|
|
|

|
|
|
|
Based on this criterion, Sewerage Basic Plan, which shows |
|
the suitable area for Joukasou and Sewerage Systems in each |
|
Prefecture has been formulated, and rational wastewater |
|
treatment for preservation of water quality in public water |
|
bodies have been promoted. |
|
|
|
 |
|
|